Otterblog

A record of the renovation of a
Wooden Drascombe Longboat 'Otter'


6th March 2007. Dry-fitted second strakes.

The garboard strake now fits the transom.

Dry fitted the second strakes.

Drilled and bolted M6.

Also gave lockers a coat of International Danboline.

<Previous Home Next>


Unless stated otherwise, Colin Watt 2006, 2007

Please read the disclaimer.


Last updated: 10 March, 2007